The rehearsal methods of ERP-systems implementation
- Подробности
- Опубликовано: 23.05.2025 16:54
- Автор: Демьянов Н.А., Сорокин М.М., Степанов Д.Ю.
- Просмотров: 44

Abstract: the article has analysis of preparatory activities to minimize the risk of unsuccessful go-live of ERP-system. There is typical lifecycle of ERP-system, consisting of pre-implementation, deployment and post-implementation phases, is described. The review of most used methodologies for the implementation of software products: 1C CIT and ADM, is conducted. The initiatives of pre-implementation phase as well as stages of analysis, design, realization, preparation for transition, pilot and pilot operation, allowing to rehearse the most critical tasks and reducing the likelihood of go-live failure, are considered. The application area of the identified rehearsal methods for small, medium and large IT-projects is determined.
Key words: go-live rehearsal, dress rehearsal, cutover rehearsal, dry run, ERP cutover, technical dress rehearsal, data rehearsal, blackout rehearsal, V model testing, data migration testing, technical cutover, pre-implementation, pre-implementation analysis, pre project activities.
Conference: XV International Conference on High-Performance Computing Systems and Technologies in Scientific Research, Automation of Control and Production, Russia, Barnaul, 23-24 May 2025 (HPCST – 2025).
Download: PDF (presentation).
Выходные данные
Демьянов Н.А., Сорокин М.М., Степанов Д.Ю. Методы репетиции внедрения ERP-систем // Высокопроизводительные вычислительные системы и технологии. – 2025. – т. 8, № 1. – c.137-142. – URL: https://stepanovd.com/science/conference/198-2025-vvst-rehearsal.